THE PROJECT IMPLEMENTATION PROCESS
STEP 1 – CONSULTANCY / DESIGNING
- 1.1. Development of a conceptual design and presentation of the suggested solutions to the client
-
- – Preparing conceptual design for the best technical solution, based on a client’s wishes and requirements, which already takes into account all the physical limitations, as well as a rough estimate of required technical equipment
- – Presentation of the suggested project’s technical solution to the client with detailed financial estimate of the cost of implementation
- – Client’s approval of the proposed solutions and harmonization of all the technological requirements
- 1.2. Design of a control system and production of wiring diagrams, with an inventory of all installed components
- – Preparation of a project solution and appropriate project documentation (building permit, detailed design)
- – Production of electrical wiring diagrams with the distribution of elements in control cabinets and counters
- – Preparation of a complete inventory of materials for an order of installed components
STEP 2 – PRODUCTION
- 2.1. Supply of control and regulating components, switchgears, and ancillary equipment
- 2.2. Production and binding of control cabinets, control counters, and other devices
- – Production of a control cabinet with all the cuttings, lighting, air conditioning, filters, fans, etc.
- – Installation of the elements on the mounting plate in accordance with the electrical documentation
- – Wiring of all the elements and of the entire control to the terminals or connectors
- 2.3. Production of a control software, HMI interfaces and control system
- – Production of basic software for the functional operation of the designed control (PLC program)
- – Production of a software for HMI interface with graphic symbols and pictures
- 2.4. Testing of the control’s basic functional operation and protection
- – Installation of the software and functional operating test for I/O units and other controls
- – Setting the power protection for hardware and software
- 2.5. Inspection and measurement of machinery and equipment at the customer
- – Execution of all the necessary measurements for the installation of the control and other ancillary equipment on the installation object
- – Production of a suspension console and ancillary construction for the installation of the entire electrical equipment
- 2.6. Production of cable routes and cabling
- – Production and installation of suspension consoles, cable trays, pipes, and cable routes
- – Installation of power cables and other control and signal leads
STEP 3 – INSTALLATION
- 3.1. Installation of all the control and regulating equipment, as well as all the ancillary devices (control cabinets, limit switches, flow, pressure, temperature, and force meters etc.)
- – Installation of all the electrical equipment with suitable mechanical protection
- 3.2. Binding and electrical connection of all of the control system components
- – Connecting all components of the electrical equipment.
- – Implementation of all grounding connections and potential equalization
STEP 4 – TESTING
- 4.1. Testing and setting of all limit values and reference positions on the device
- – Connecting electrical equipment to the power and setting all switches, sensors, transmitters, etc.
- – Proper calibration of measuring devices and setting of all the reference fluxes
- 4.2. Functional performance tests and roll-out
- – Starting functional tests for all of the equipment on the individual stages and system as a whole
- 4.3. Implementation of electrical measurements
- – After a functional test and other successfully completed tests follows an implementation of measurement and test operation of safeguards
- – Creating a measurement protocol for the performed measurements
- 4.4. Hardware and software optimization
- – Proper software optimization for the optimal performance characteristics of an entire device or line
STEP 5 – DOCUMENTATION / COLLECTION
- 5.1. Preparation of the project of implemented works, operation and maintenance manual
- 5.2. Delivery of the project documentation to the customer
- 5.3. Final hand-over test with functional test and verification of agreed results